Page 20 - Davenport Tooling Catalog

Basic HTML Version

Order:
586-465-5000
Fax:
586-465-3030
18
44725 TR INI TY DR I VE • CL INTON TOWNSH I P , MI 48038 USA • WWW. SLATERTOOLS .COM • D I RECT@SLATERTOOLS .COM
Step 1
A. Assemble tool slide on base with spring and socket head cap screw set to 9/16 travel of tool holder.
B. Lock set screw to hold socket head cap screw in place.
C. Allow taper gib to be quite loose.
Step 2
A. Compress holder in vise or on an arbor press to 9/16 travel.
B. Tighten gib adjusting screw until gib will hold tool slide in
maximum travel position.
Step 3
A. Clamp shank of base in vise.
B. Loosen gib adjusting screw very slowly until holder snaps open.
C. Tighten locking set screw to hold gib adjusting screw in place.
D. Holder is ready for use.
How to set holder after
Maintenance
A B C D E F
3/8 3/4 .050 .310 .100 1-1/2
3/8 3/4 .060 .380 .120 1-1/2
Recess Tool Blanks
Hardened and Ready To Use
Recess tool draw-bars hold the top slide of the recess holder in place to activate the upward cutting of a recess tool. Holder comes equipped with draw bar.
Replacement Order No.
RTD-71001.
(TD) Tool Diameter 3/8
(SD) Shank Diameter 3/4
(OS) Tool Offset from Shank .031
(FT) Forward Travel .562
(EH) Expansion Height .161
(SL) Shank Length of Tool 3/4
Recessing Tool Holder
Order #
RTH-7910
For use with
5/8” or 7/8” Model “B”
Used to make internal grooves, undercuts and chamfers.
Pre-notched at 90˚, and centers provided at both ends.